Redesign and sourcing of a premium beverage cooling system
With this redesign and sourcing project, LeChiller® rethought its refrigeration system to deliver a more high-performance, industrial-ready solution. Kickmaker’s teams provided technical support throughout the project.
Project abstract
◾️ The challenge:
LeChiller® wanted to develop a new version of its beverage cooling system. The concept is based on a reservoir that cools a water–glycol mixture down to −35°C, into which bottles are inserted without direct contact with the liquid. The goal was to optimize the design and industrialize production while ensuring performance and reliability.
◾️ The solution:
Kickmaker supported LeChiller® in redesigning the product, optimizing the design and identifying industrial partners capable of manufacturing the new version in Europe.
◾️ The benefits:
An approach addressing three key challenges:
1️⃣ Optimized design for improved aesthetics and enhanced performance.
2️⃣ Streamlined production through efficient industrial sourcing.
3️⃣ European manufacturing ensuring quality and proximity.
Technical developments
This project is the result of a collaboration between LeChiller®, Elium Studio, and Kickmaker. As a technology partner, Kickmaker contributed its expertise across several key areas:
-
Product design in collaboration with Elium Studio to deliver a more refined version.
-
Development of a riveted sheet-metal structure ensuring robustness and a high-quality finish.
-
Integration of a user interface with buttons and indicator lights for an intuitive experience.
-
Industrialization using plastic and metal injection, overmolding, thermoforming, and European sourcing.
-
Validation of reliability and durability through testing.
Key achievements
Thanks to our expertise in industrial design and industrialization, we supported LeChiller® at every stage of product development:
-
Product optimization for improved efficiency and easier manufacturing.
-
Selection of reliable industrial partners to ensure high-quality production.
-
Implementation of European manufacturing to reduce lead times and improve oversight.
Discover Kickmaker’s expertise
Innovation.
01. Strategy
for design and industrialization.
Define your product development possibilities and the right manufacturing setup to match.
Manufacturing.
02. Product Design
and industrialization.
From POC to mass production, with turnkey industrialization or targeted support at specific stages.
Anticipation.
03. Product lifecycle
management.
Production monitoring, quality control, and in-series product lifecycle tracking.
